
CS-2000 Static Dissipative
Anti-static flooring paint designed for electrostatic-sensitive environments, with a stable conductivity range of 10⁶~10⁹Ω. Utilizes self-conductive nanocomposite technology to achieve standard dissipative anti-static performance without the need for additional carbon black brushing or copper foil installation. Complies with GB/T 36340-2018 "General Specification for Anti-static Raised Access Floors" and ANSI/ESD S20.20.
Application Effect Showcase


Technical Specifications
Authoritative Test Report
Testing Agency: Quality Supervision and Inspection Center for Aging of Chemical Synthetic Materials (Guangzhou Aging Institute)
Report No. TL26040110 | Testing Period: 2026/3/4 to 2026/4/1

Construction Process
Ensure the base is dry, solid, and dust-free.
Concrete moisture content ≤ 8%, compressive strength ≥ 25 MPa. Use professional grinding equipment and vacuum clean.
Install a copper foil grounding grid with 6m x 6m spacing.
Use 0.05mm oz copper foil laid along walls and gridlines, connected to the building grounding terminal. Grounding resistance < 10Ω.
Electrostatic conductive intermediate coat applied by roll coating to establish a conductive path.
Apply 0.15–0.2 kg/m² to ensure good contact with the copper foil. Allow to dry for 4–6 hours.
Apply conductive topcoat to complete the anti-static system.
Apply at a rate of 0.1-0.12 kg/m² using a cross-hatch pattern for two coats, with an interval of 6-8 hours between coats. Total dry film thickness ≥ 0.3 mm.
Use a surface resistance tester to measure all parameters.
Test at least 3 points per 50㎡, recording surface resistance, volume resistance, and electrostatic decay time to ensure compliance with design requirements.
Important Notes
Construction Safety and Quality Control
- Construction must be performed by a professional crew.
- Pre-construction testing of substrate moisture content and electrical conductivity
- The grounding system must be securely connected and pass inspection.
- Strictly control construction environment temperature and humidity
- Inspect and confirm after each step.
- Minimum curing period: 7 days
- Regularly inspect anti-static performance (recommended every 6 months)
- Do not cover the floor with insulating materials.
Maintenance Guide
Need professional construction services?
We provide professional flooring installation teams to ensure optimal results.
Contact our expert team